24 January 2020 12:55 PM-2:10 PM Testing U-Bahn Signals with TPWS Overspeed Sensor. TPWS OSS Placed at Tutuban. Additional signals placed at...
24 January 2020 International Rice Research Institute (IRRI) Los Baños, Laguna Area: [ATTACH]
23 January 2020 Constructed Alabang Depot track and facility. Terrain Adjustment on Laguna De Bay. (Others for Collaboration)...
23 January 2020 Platform and Destination Marker placement between Alabang and Pansol (No portals yet as of this documentation): NEW FEATURE:...
22 January 2020 Platform, Portal and Destination Marker placement between Tutuban and Alabang: (Screenshots arranged in Descending Order)...
22 January 2020 Added SB Platform at Sta. Rosa and NB Platform at San Pedro. Lengthened platforms at Sta. Rosa NB and San Pedro SB. Placed TPWS...
20 January 2020 ---No track/platform placement due to Maps API key not functioning. (Wait until card issue settled/further notice)--- NSCR...
14 January 2020 ---Track Placement is Currently Suspended following Taal Volcano Eruption-Wait Until Further Notice--- No track...
13 January 2020 Test Track as Safety Measure on NSCR Line: (Now with Updates on Tutuban-Solis Triangle) [ATTACH]
I played that scenario but I got no issues. Did you try it again? <screenshot below> [ATTACH]
13 January 2020 ---Track Placement is Currently Suspended following Taal Volcano Eruption-Wait Until Further Notice--- Bridge placement on...
Route Builder, Philippine National Railways: Generations from Past - Future. Route is Open for Collaboration.
12 January 2020 Removed previous junctions based from the previous log. Welded into the mainline. Platform placement at Pansol and Pacita...
12 January 2020 España: [ATTACH] RWA BR 423 S-Bahn Rhein-Main on its test run on NSCR Tracks: [ATTACH] Calamba to Los Baños: [ATTACH]
11 January 2020 Notice from 10 January 2020: Additional rolling stock to be deployed on the following test runs: SNCF TGV Duplex...
10 January 2020 Notice from 7 January 2020: Unfortunately, Route Building has been suspended extended until 11 January 2020. I will return on...
7 January 2020 Terrain Adjustment on San Juan River in Calamba. River placement on San Cristobal River in Banlic. Placed 62 km of track from...
7 January 2020 Calamba Area: [ATTACH] Calamba-San Cristobal River Area: [ATTACH]
Any news?
6 January 2020 Reached CALABARZON Region 4A (Laguna Province). Track Types between Pasay Road and Alabang changed to Concrete 1 LZB. Changed...
6 January 2020 Overall map from Tutuban and Calamba: [ATTACH] Alabang Area Update: (Junction to Phase 3 and Depot): No bridges yet as of this...
I have the ICE 3 Velaro D loco add-on. Is there any chance that this train can be updated with TVM430 and KVB Signalling? I played a lot on...
5 January 2020 Pasay Road Station: (NSCR Line diverges to current Commuter Line): [ATTACH] Alabang Area Update (Muntinlupa Side): [ATTACH]...
5 January 2020 Changed position of Catenary Return Loft on NSCR at Pasay Road Area. Speed Upgrade between Edsa and Bictuan with a maximum speed...
4 January 2020 Overhauling NSCR Tutuban - Solis Triangle to correct allignment. (Based on NLEX-SLEX Connector road animation below): [MEDIA]...
4 January 2020 Sta. Mesa Area with PNR North-South Commuter Railway Viaducts: (Please note no NSCR platforms placed yet at España, Sta. Mesa,...
3 January 2020 Alabang Area: [ATTACH] Tutuban Area: (Junctions to Existing and Future Line): [ATTACH]
Beginning 3 January 2020, each log during route development of Philippine National Railways route will be posting screenshots here during its work...
3 January 2020 Starting 3 January 2020, each log will include Timeframe, Log Number and Route size. Fixed potential broken rail at San Andres...
2 January 2020 Double tracks added until Sucat. Single Track added from Sucat and Alabang. Placed missing catenary wires in Tutuban (to Catenary...
1 January 2020 Track laying commenced around Tutuban and Sta. Mesa. Added tracks for LRT Line 1 between Bluementritt and Tayuman. Finished...
Additional map can be found here:...
This thread is for Discussion about the route and Contacting for Route Collaboration.
Part 3 of PNR Bicol Express/Mayon Limited Line: [ATTACH] [ATTACH] [ATTACH]
Part 2 of PNR Bicol Express/Mayon Limited Line: [ATTACH] [ATTACH] [ATTACH] [ATTACH] [ATTACH]
Part 1 of PNR Bicol Express/Mayon Limited Line:[ATTACH] [ATTACH] [ATTACH] [ATTACH] [ATTACH]
Part 3 of PNR North Construction for Train Simulator:[ATTACH] [ATTACH] [ATTACH]
Part 2 of PNR North Construction for Train Simulator:[ATTACH] [ATTACH] [ATTACH] [ATTACH] [ATTACH]
[ATTACH] [ATTACH] [ATTACH] [ATTACH] [ATTACH] Part 1 of PNR North Construction in Train Simulator:[ATTACH] [ATTACH] [ATTACH] [ATTACH]
This is for the Update Thread for Future Philippine National Railways Route. REQUIRED DLC: TBC Route Map of PNR: (Former/Current/Closed) -...
Separate names with a comma.