Covert them to console? Impossible. They would need to redo the whole route. At least they would still have all the reference and the license....
You could do it in the Livery Designer. Only thing is, you most likely won’t see an AI train using it.
Is that when it goes through the tunnel?
Hold Circle.
Cant really reduce how much it crashes, you CAN increase how much you save though.
Good. It feels sluggish.
Nope. TSW has the same amount of routes on PC as on PS4/XB1. You’re talking about Train Simulator, which is a completely different game.
As long as it’s interesting I'm cool with not operating at 140. But give me at least 1 service where I can exceed 90.
Phew. As long as it's faster than GWR.
"Southeastern HIGH SPEED" seems legit.
You know very well they aren't expanding that route. The number of services would be too high for consoles to handle.
The North London/Goblin Lines of the London Overground are already in TSW 2021. It would be nice to see them make a appearance in TSW.
As stujoy has already stated. It ain’t gonna happen. But, I would love to see them prove us wrong.
It would be easier to rebuild the whole of NEC than to bring it over so they opted not to do it. They still have the AMTRAK license so there’s a...
I’ve noticed, with the IOW route, you can adjust exactly how far down you want your window to go. On other locos like the M7/72 Stock/etc. can...
SKA: S-Bahn/Freight from RRO HMA: Regional/Freight from HRR/RSN/RRO?
I think Atlantic Av - Hempstead is 1 train every 20 Mins.
Really? Damn, they've been working on it for a while. Well, at least there might be less of a chance it'll release with hundreds of bugs.
SAM!
Sold. Another person supporting it.
I'd feel better if you said 5-7 months.
That'd be awesome. Most of the "Rants" would go. I heavily doubt it though. Not really a "Project", but who knows.
It can take up to 12-15 months to create a route. I believe it was "in planning" on the first roadmap. We ain't getting it till Late January -...
I second this.
Damn 5 Train.
Longest I've been stuck on the train is an hour and a half. There were major delays.
That's insane.
Port Washington should be the first. They disrespected us with that fake line. Then complete the Ronkonkoma Branch, then add the M9's/DM30AC's and...
Thameslink would be great. But it would destroy consoles while in London. London to Brighton is probably possible though.
Red & Yellow signals usually appear because of another train being in front of you. The signal block will clear after the train in front leaves...
It really depends. If you're hardcore into trains, you may be split. The lack of services on many routes, the inaccuracies, and the bugs may turn...
I'd say it's coming late January - Early March. We don't want them to rush this route.
Sounds that need fixing: Traction Motor Clicking sounds Track Noise Ahem... PASSENGER ANNOUNCEMENTS
Separate names with a comma.