As i said in the other thread, some signal works as a protection, this is the case. The train cooming from a 120kmh section to a 90kmh section to...
It is a different calibration of the breaking force. The 423 works good with 7 brake handle. The 425 works good with 5. But the first one is...
The problem with the pzb is that is set to work with the hold german type of signals. With the new ones (like on the high speed line) if the...
I'm a real train driver and i can confirm it is a bug, just tried the scenario now. The pzb system is not easy to understood and sometimes there...
The signal is ok. There are a lot of place where you can find it. This german signal system doen't have the approach or the expected, normally...
There isn't a problem. The track speed is ok. Just checked again. There are some switch that can be done up to 140kmh (like one in MSB for...
Thanks for the info. However that was just an exemple, but if you say that koln is a terminal too with some IC maybe is possible to use the Koln...
Just for info, in theory in italy our maximum lenght of the train is near 3km. Because our normal signal block is 3.200m. Another things. For ATC...
Ok let me show you how it works. In italy we have the SCMT like aa safety system (i will say it in the easy way). When you prepare the train to...
I know. There are a lot of locos that the games needed to be much real. But at the moment a better banking loco could be the br155 but because it...
The problem is easy. With the tsw2 physics (that is much similar of real life than tsw2020) an uphill with 2,1% of grade is very complicated to...
It is the same. Because the problem it is the 500hz magnet, and seems the problem happen when you need to switch in a dead track.
40 is for the swithch. 30 the speed that you need to asume after that signal
I have read the comment of the other guy but i need to do a clarification. The speed on the line that end in a buffer is 40. 30 is just the safe...
Same happened to me. But in the other direction to aschaffenburg bay. You have done all in the perfect way. It is a bug because the 500 magnet...
Same on LIRR the livrery just change the formation of the M7 (8/6/4 cars)
Thanks.... too complicated to put all service on just the Br185...
I know. However the number don't say the truth. For exemple at the moment the SKA says 110 services on time table. If you select the br185 you can...
Yes but not directly. For exemple some intermodal wagon and mixed trains in the RRO or the train stopped at duren on SKA. The possibility are a...
There are a lot of trains and there is a lot to do. Just 1 horrible thing for me. Expetially in the middle of the routes (to daisburg) there are a...
The problem is that the freight yard of koln is located in the north part of the route (up of the koln depot in the game) and it is in the...
Buy it immediatly. It is one of the best route. Expetially if you have all german dlcs. There are more than 310 services on time table, freight,...
Right. But in my opinion is just a problem to release all preserved routes as soon as possible. For this reason i continue to say to a wait a bit...
And remember that in future we will have the intercity service too. Just remain some freight wagons in the yard (just for scenario) and some...
Yes, when the RRO will comes out the SKA will be one of the busier route with the HRR
When the RRO dlc will be release the SKA will recive the S-bahn service too (that run on the line near the Highspeed line)
Sure but remaster (and testing) require more man at work for the preserved team. Maybe without the remastered, the mun - aug routes was came out...
I know but keep in mind that the original plan was to just make a porting of the "old" route. After the community feedback they decided to make a...
At the moment i think is better that they continue with the preserved collection release, so after all routes will comes out, a large part of this...
This will be a dream. This is because i continue to say that we need the extention of theese routes. Honestly HRR and RRO can be added to the RSN...
I think that the problem with the sound affect directly the locos br 143/146/185 and not just the route (same on RSN). Probably we will have the...
Exactly. Exemple GP38 guide. And a complete guide of all the things. Honestly manuals are really boring and sometimes they could not help you in...
Yes, there are a lot of things that can be done with koln - aachen. Keep in mind that when the RRO dlc will be release we will get the s-bahn...
It is good idea. However is better that you add shutting procedure and how to menage an heavy fright train, expetially because you want to start...
The Falns car as the name says can run at max 100kmh when is loaded. You can see on the wagon the marker S and 120 with 0.00t that means if the...
Thanks to you. However yes all wagons can run up to 120kmh (this is the service max speed, however they max real speed normally is 10 or 20 kmh...
Need to check it again, but it need a huge brake force. This is one of the "grey zone" of the pzb. For this reason i still prefer the SCMT in...
Yes but in this case the signal ahead is not a STOP but a switch for this reason the 500 magnet mustn't be activated because i'm slowing down for...
Yes with this problem. But becauss there is no number for the speed, directly reduce to 45kmh (with a slowly reduce of the breaking force after...
No. Wait. Just tried 3 times and there is a bug with the pzb (i'm on ps4). The 500 magnet activates in the wrong place. Let me explain. You are...
No. All the train becames U type. For this reason is used to use all "M" or "U" wagons for a configuration if is possible. This is why today if...
Every wagon type has a maximum speed that it can run. Normally you can see it on the wagon, but for exemple every wagon has a classification, for...
Just tried, and yes it is a bit forced but is possible to do. However you need to slow down until 40 as you see the first distant signal, than you...
I'm running the route now so i can show you how i do it
Understood your question. So let me explain. You have done everything good, but you can do it better. When you reach the first signal speed (15)...
Not completely. You can recover from the Sifa, you need just to acknowledge it again and reset the power during the run. But if you miss a pzb or...
Not completly. The AWS magnet is placed 200/300m before the signal that you need to respect. The 1000 magnet (start of pzb zone) is located at the...
In game and real life the limit are 165/125/105 but this is the maximum permitted, at 165,1/125,1/105,1 the pzb The maximum speed that you will...
Exactly. The max permitted speed is 125 (exemple) but the running speed is 120. Sometimes could happen the the train gives just 1 or 2 kmh...
Thanks. However this is just the theory. In practice is very different. Exepetially with the 500 magnet
Separate names with a comma.