(abandoned) Philippine National Railways: Luzon System (freeware)

Discussion in 'Content Developer's Area' started by markandrei24, Dec 31, 2019.

  1. markandrei24

    markandrei24 Active Member

    Joined:
    Dec 31, 2019
    Messages:
    188
    Likes Received:
    25
    13-16 December 2020
    13 December
    • Platform height adjustments at Buendia, Edsa, Nichols, FTI, Bicutan, Sucat and Alabang.
    • Terrain fixes at Alabang.
    16 December (Unscheduled)
    • Canopy re-placed at Alabang.
    • Platform height adjustments at Muntinlupa, San Pedro, Biñan, Sta. Rosa, Cabuyao, Gulod, Mamatid, Calamba and Solis.
    Warnings/Faults
    13 December
    • Out of Memory crash at FTI.
    • Out of Memory crash at Alabang. (x5)
    16 December (Unscheduled)
    • Out of Memory crash at Sta. Rosa.
    • Out of Memory crash at Mamatid. (x3)
    *Gradient tool crashes (memory leak/low page file?)

    Timeframe: 10:30 AM-11:25 AM, 3:35 PM (Maintenance) GMT+8 Philippine Standard Time
    Route Update Number: 77
    Route Size: 387786 KB/378 MB (.rwp), 493 MB (522 MB Size on disk) if installed
     
  2. markandrei24

    markandrei24 Active Member

    Joined:
    Dec 31, 2019
    Messages:
    188
    Likes Received:
    25
    17-23 December 2020

    17 December (Unscheduled)
    • Platform height adjustments at Caloocan and Malabon.
    • Some Terrain changes.
    18 December
    • Platform height adjustments at Valenzuela, Meycauayan, Marilao, Tabing Ilog and Bocaue.
    • Fence removal on embankment section at Balagtas.
    23 December
    • Platform height adjustments at Balagtas, Tuktukan, Guiguinto, Malolos South, Malolos, Calumpit, Apalit, San Fernando and Clark.
    • Platform placement at Angeles City.
    • Canopy placement at Tuktukan, Malolos South, Calumpit, Apalit, San Fernando and Angeles City.
    • Complex track laying at Clark and Mabalacat area (Part 1).
    • Some electrification changes on portions from Calumpit to Clark.
    Warnings/Faults
    17 December (Unscheduled)

    • Out of Memory crash at Malabon.
    *Gradient tool bug

    Timeframe: 9:30-10:20 AM (Dec 18), 1:20-2:40 PM GMT+8 Philippine Standard Time
    Route Update Number: 78-79
    Route Size: 387808 KB/378 MB (.rwp), 493 MB (522 MB Size on disk) if installed
     
  3. markandrei24

    markandrei24 Active Member

    Joined:
    Dec 31, 2019
    Messages:
    188
    Likes Received:
    25
    25-28 December 2020

    25 December
    11:30 AM-1:00 PM

    • Complex track laying around Clark and Mabalacat.
    • Track, Tunnel and Station works at Clark Airport spur line.
    4:05-4:40 PM
    • Temporary removal of Clark and Mabalacat track except Clark Airport Spur line (Partial only). (New Data found on map)
    27 December (Combined timeframe)
    • Reworked Mabalacat track and rest of Clark Airport Spur Line.
    • Terrain changes at Tutuban.
    • Track laying until Bamban.
    • Track laying at Tutuban area.
    28 December
    • Track laying until New Clark City. (NSCR)
    • Speed limit works from Malolos to New Clark City.
    • Platform and Canopy placement at Clark.
    Notes:
    • Cannot work with other lines (Connecting LRT Line 1, 2 and MRT 3.)(Cause: Layout Complexity)
    • Cagayan line will feature until San Jose City. Will place portals past San Jose City. (Cause: Terrain Complexity)
    Warnings/Faults
    • Program hang at Angeles City.

    Timeframe: 11:30 AM-1:00 PM (Dec 25), 4:05-4:40 PM (Dec 25), 12:20-1:10 PM (Dec 27), 2:20-2:30 PM (Dec 27), 2:50-3:10 PM (Dec 27), 4:25-6:55 PM (Dec 28) GMT+8 Philippine Standard Time
    Route Update Number: 80-82
    Route Size: 388280 KB/379 MB (.rwp), 493 MB (523 MB Size on disk) if installed
     
  4. markandrei24

    markandrei24 Active Member

    Joined:
    Dec 31, 2019
    Messages:
    188
    Likes Received:
    25
    29 December 2020-2 January 2021
    29 December 2020 (Unscheduled)
    • Preparatory works at New Clark City (North Long Haul.)
    31 December 2020
    • Tunnel placement on portions of Clark and New Clark City.
    2 January 2021 (Emergency fix - after internal issue)
    • Minor terrain changes
    Note: Route building will be temporarily suspended after internal issue and observance.

    Timeframe: 12:30-12:40 PM (Dec 31 2020) GMT+8 Philippine Standard Time
    Route Update Number: 83
    Route Size: 388294 KB/379 MB (.rwp), 493 MB (523 MB Size on disk) if installed
     
  5. markandrei24

    markandrei24 Active Member

    Joined:
    Dec 31, 2019
    Messages:
    188
    Likes Received:
    25
    6-9 January 2021
    6 January (Unscheduled)
    • (Mainline North) Additional track laying at New Clark City.
    • (NSCR) Removed buffer lights at Malolos.
    7 January
    • (Mainline North) Track laying until Capas.
    9 January
    • (Mainline North) Additional Track laying in Capas/Tarlac City area.
    Timeframe: 12:55-2:00 PM (Jan 7), 9:20-9:35 AM (Jan 9) GMT+8 Philippine Standard Time
    Route Update Number: 84-85
    Route Size: 388576 KB/379 MB (.rwp), 494 MB (524 MB Size on disk) if installed
     
  6. markandrei24

    markandrei24 Active Member

    Joined:
    Dec 31, 2019
    Messages:
    188
    Likes Received:
    25
    25 January 2021
    • (NSCR) Reworked Clark Airport Spur. (Data found on Map.)*
    *Speed limits not yet changed
    *Actual Terrain may change without notice


    Timeframe: 8:30-9:20 AM GMT+8 Philippine Standard Time
    Route Update Number: 86
    Route Size: 388585 KB/379 MB (.rwp), 494 MB (524 MB Size on disk) if installed
     
  7. markandrei24

    markandrei24 Active Member

    Joined:
    Dec 31, 2019
    Messages:
    188
    Likes Received:
    25
    3-16 February 2021

    3 February
    (NSCR) Clark Airport Spur Changes:

    • *Speed limits changed
    • *Rework terrain
    Other:
    • (NSCR) Flyover walls at Banlic Depot
    • (Mainline) Track laying on Capas.**
    **No data available on track layout, only done by myself. (Fictional)

    15 February
    12:00-1:10 PM

    • (Mainline) Track laying until La Paz.
    5:50-7:10 PM
    • (Mainline) Track laying until Aliaga.
    16 February
    • (Mainline) Track laying until San Jose City.
    • (Mainline) Stations constructed at Talavera.
    • (River) Abacan, Quitangil
    Notes:
    1. New Requirement: WCML South (Use of Catenary and other bridge lofts)
    2. Retry Cagayan Valley segment if possible
    Timeframe: 6:50-7:30 PM (Feb 3), 12:00-1:10 PM (Feb 15), 5:50-7:10 PM (Feb 15), 12:35-3:20 PM (Feb 16) GMT+8 Philippine Standard Time
    Route Update Number: 87-89
    Route Size: 389265 KB/380 MB (.rwp), 495 MB (525 MB Size on disk) if installed
     
  8. markandrei24

    markandrei24 Active Member

    Joined:
    Dec 31, 2019
    Messages:
    188
    Likes Received:
    25
    16-20 February 2021

    16 February (Unscheduled)
    • (Mainline) Track laying until Dupax Del Norte.
    17 February (Unscheduled)
    • (Terrain) Adjustments at Carranglan area.
    17 February (4:50-7:55 PM)
    • (Mainline) Track laying until Cabarroguis, Quirino.
    18 February
    • (Mainline) Track laying until Echague. (Portions 4-track)
    19 February
    9:10-9:50 AM

    • (Mainline) Added portions 4-track. (remaining)
    10:55 AM-1:20 PM
    • (Mainline) Track laying until Angadanan.
    • (Mainline) Added missing track segments.
    6:00-9:30 PM
    • (Mainline) Track laying until Naguilan.
    20 February
    • (Mainline) Track laying until Tuguegarao (Planned).
    • (Mainline) Platform placements at Dupax Del Norte, Cabarroguis, Echague, Naguilan, Ilagan and Tuguegarao (Planned).
    • (Mainline) Start of Phase 4 Trackworks (Subic - Clark)
    • (Mainline) Track laying until Mabalacat.
    • (NSCR) Added depot line at Mabalacat. (Depot not yet constructed -- in final phase)
    Note: Route will be named as PNRLUZON_TS (Philippine National Railways Luzon System).

    Timeframe: 4:50-7:55 PM (Feb 17), 6:05-9:00 PM (Feb 18), 9:10-9:50 AM (Feb 19), 10:55 AM-1:20 PM (Feb 19), 6:00-9:30 PM (Feb 19), 3:10-8:30 PM GMT+8 Philippine Standard Time
    Route Update Number: 90-93
    Route Size: 391322 KB/382 MB (.rwp), 499 MB (530 MB Size on disk) if installed
     
  9. markandrei24

    markandrei24 Active Member

    Joined:
    Dec 31, 2019
    Messages:
    188
    Likes Received:
    25
    21-25 February 2021

    21 February
    10:50 AM-12:45 PM

    • (Mainline) Track laying until Floridablanca.
    5:00-6:00 PM
    • (Mainline) Track laying until Dinalupihan portal (tunnel).
    22 February
    • (Mainline) Track laying until Subic Container Terminal.*
    *Remainder work will be on Phase 11. (Including Mabalacat Depot works for NSCR)

    23 February
    • (Mainline) Track laying until Agdangan.
    24 February
    • (Mainline) Track laying until Gumaca.
    25 February (Unstable Schedule but logged)
    • (Mainline) Track laying until Liboro.
    Timeframe: 10:50 AM-12:45 PM (Feb 21), 5:00-6:00 PM (Feb 21), 3:55-6:30 PM (Feb 22), 3:25-8:15 PM (Feb 23), 5:50-6:50 PM (Feb 24), GMT+8 Philippine Standard Time
    Route Update Number: 94-98
    Route Size: 391939 KB/382 MB (.rwp), 501 MB (533 MB Size on disk) if installed
     
  10. markandrei24

    markandrei24 Active Member

    Joined:
    Dec 31, 2019
    Messages:
    188
    Likes Received:
    25
    26 February-3 March 2021

    26 February
    • (Mainline) Track laying until Naga.
    27 February
    • (Mainline) Track laying until Iriga.
    28 February
    10:10 AM-12:20 PM

    • (Mainline) Track laying until Legaspi. (Completed Phase 5)
    3:20-8:00 PM
    • (Mainline) Track laying until Matnog. (Completed Phase 6)
    1 March
    11:50 AM-12:05 PM

    • (Mainline) Track laying until Tarlac. (Start of Phase 7)
    4:00-6:50 PM
    • (Mainline) Track laying until Mangaldan.
    2 March
    • (Mainline) Track laying until San Fernando (La Union). (Completed Phase 7)
    • (Mainline) Track laying until Lipa. (Phase 8 Completed Portion, will place portal instead)
    3 March (Unscheduled)
    • (Mainline) Integrated North and South.
    • (Mainline) Constructed Clark Logistics tracks.
    • (NSCR) Tunnel wall placement at Clark Spur.
    • (NSCR) Constructed Mabalacat Depot.

    Warnings/Faults
    28 February (3:20-8:00 PM)

    • Potential CTD at Castilla. (Unsure)(Possible Out of Memory Crash)
    Limitations
    • Spacing issues in embankment segment of NSCR and mainline in Malabon (Only used available assets for embankment)
    Timeframe: 6:20-8:20 PM (Feb 26), 3:45-4:50 PM (Feb 27), 10:10 AM-12:20 PM (Feb 28), 3:20-8:00 PM (Feb 28), 11:50 AM-12:05 PM (Mar 1), 3:05-8:00 PM (Mar 2) GMT+8 Philippine Standard Time
    Route Update Number: 99-103
    Route Size: 393826 KB/384 MB (.rwp), 505 MB (537 MB Size on disk) if installed
     
  11. markandrei24

    markandrei24 Active Member

    Joined:
    Dec 31, 2019
    Messages:
    188
    Likes Received:
    25
    11 March-24 May 2021

    11 March
    • (Mainline) Constructed Sucat South Long Haul Station.
    • (Scenery) River placements
    • (Terrain) Painted portions at Carranglan area
    12 March (Unscheduled)
    • (Scenery) River placements
    • (Mainline) Smooth gradient fix on Calauag - Tagkawayan and Porac - Floridablanca portions
    14 March (Unscheduled)
    • (Scenery) River placements
    15 March (Unscheduled)
    • (Scenery) River placements
    • (Mainline) Added missing track near Matnog.
    • (Mainline) Smooth gradient fixes on route portions.
    • (Terrain) Terrain adjustments
    16 March
    • (Scenery) River placements
    17 March-24 May
    • (HS-Fictional) Track laying from Alabang to Legaspi (HS).
    • (Scenery) River placements
    • (HS-Fictional) Track laying until San Carlos (HS).
    • (Tunnel) Trials on NSCR and Subic - Clark Railway.
    • (HS-Fictional) Junction between the Mainline and HS-Fictional added.
    • (Mainline-Temporary) Depot Works at Dagupan and Tuguegarao.
    • (Mainline) Depot Works at Los Baños, Naga and Legaspi. (Location revealed -- not exact)
    • (Track) Speed limit works
    • (Mainline) Batangas line removed and replaced with portals.
    • (NSCR) Gradient rework at Banlic Depot. (Access track only)
    • (NSCR) Access track changed at Valenzuela Depot.
    • (Mainline) Secondary speed limit in south changed to 100 km/h as per document (See page 84-87). (Initial)
    Warnings/Faults
    29 April
    • Out of Memory crash at Liboro.
    7 May
    • Out of Memory crash at Sariaya.
    Note1: Tracks are not yet in actual ones. (Actual plan for those not yet revealed, and will be reconstructed once plans revealed in actual if deemed necessary.(Route will be cloned))
    Note2: This route will continue to be built but it will be ocassional.
    Important Notice: Due to issues of mod selling (in other games) in our country, this route will be strictly private and will not be released until further notice xD
    New Requirement: Chengdu - Suining High Speed (Reason: Use for bridges)
    Removed Requirement: LGV Rhone-Alpes and Mediteranee



    Timeframe: 11:25 AM-1:55 PM (Mar 11), 5:15-5:40 PM (Mar 16) GMT+8 Philippine Standard Time
    Route Update Number: 104-106
    Route Size: 393826 KB/384 MB (.rwp), 505 MB (537 MB Size on disk) if installed
     
    Last edited: May 24, 2021
  12. markandrei24

    markandrei24 Active Member

    Joined:
    Dec 31, 2019
    Messages:
    188
    Likes Received:
    25
    25 May - 22 July 2021
    • (Mainline) Platform placements on the mainline segment.
    • (Mainline and NSCR) Change platforms due to non-opening of doors.
    • (Mainline and NSCR) Start of designing platforms.
    • (Mainline) Start of Tunneling works.
    • (Mainline and NSCR) Tunneling works restarted on some portions.
    • (Mainline) Fixed Casiguran - Irosin segment track layout.
    • (Mainline and HS-Fictional) Reworked speed limits on entire line.
    • (Mainline) Added double crossover at Dagupan.
    Signaling Update: Completed Segments list
    • (Mainline) San Fernando City (La Union) - Dagupan City (From 13 July 2021)(Partial complete)
    Stations Update: Completed Stations list
    1. (Mainline) San Fernando City (La Union) (13 July 2021)
    2. (Mainline) Bauang (14 July 2021)
    3. (Mainline) Caba (14 July 2021)
    4. (Mainline) Aringay (14 July 2021)
    5. (Mainline) Agoo (15 July 2021)
    6. (Mainline) Santo Tomas (15 July 2021)
    7. (Mainline) San Fabian (15 July 2021)
    8. (Mainline) Mangaldan (16 July 2021)
    9. (Mainline) Dagupan City (17 July 2021)
    10. (Mainline) San Carlos City (18 July 2021)
    11. (Mainline) Malasiqui (18 July 2021)
    12. (Mainline) Bayambang (18 July 2021)
    13. (Mainline) Moncada (18 July 2021)
    14. (Mainline) Paniqui (20 July 2021)
    15. (Mainline) Gerona (21 July 2021)
    16. (Mainline) Tarlac City (21 July 2021)
    17. (Mainline) New Clark City (22 July 2021)
    Warnings/Faults
    30 June

    • Out of Memory crash at San Fernando (Pampanga).
    2 July
    • Program hang at Malasiqui.
    7 July
    • Out of Memory crash at Segment Clark - NCC (Mainline).
    10 July
    • System hang at Carranglan. (Corrupted save)
    Note1: Cabarroguis and Ilagan Stations removed due to its inclined gradient.
    Note2: Series markers and track layout are not exactly accurate as planned.
    Note3: Tunnels are not nice enough, but done my best.
    Note4: "Test Train" Free roam scenarios not included.
    Removed Requirements: JT Common Library
    New Requirement: Three Country Corner (Use for OBB/SBB Signaling)


    Route Update Number: 107
    Route Size: 420530 KB/410 MB (.rwp), 563 MB (600 MB Size on disk) if installed
     
  13. markandrei24

    markandrei24 Active Member

    Joined:
    Dec 31, 2019
    Messages:
    188
    Likes Received:
    25
    24 August 2021 (Final Announcement)(Must read)

    After 1+ years of development of this route, unfortunately it will be abandoned due to lack of rolling stock with matching safety systems (ETCS) for both NSCR and Mainline routes and some route markers (series markers) included cannot be removed due to removed segments.
    I will still be around in the content developer's area section in the forums for making other route projects featuring Philippines, even fictional. (Example: Project Philippine Railways Series)

    I done my best building this route... but I will show the world next time! xD
    Any thoughts about this announcement can be posted on the log thread (here) or the route's discussion and reporting thread xD
     
    Last edited: Aug 24, 2021

Share This Page