This is the last run in the Journey to be done, however I do seem to be able to get pass the PN141 signal and going to PN94, there is a train in the path and I am stock at a redlight forever I have waited at the light for over 1 hrs and nothing is happening I have made 2 attempt to get through this run, but it always end at the same place
If this is the senario I am thinking of then I don't think this is a bug. I got caught by this as well and got blocked by the train sitting in the platform. This senario is an example of time critical shunting, you need to complete moving the 4 wagons on the platform and get back to PN94 before the blocking train arrives. It's tight but it can be done if you keep your speed up and complete each instruction quickly. Best of luck guys and HNY.
This not how it is intended... If you moving stock its not a way of rushing all the steps... In reallife you should keep an eye for safety and not be rushed. This is for sure a scenario timing bug
Certainly not helped by the dumb "wait one minute" instruction. If I have two nits to pick with this otherwise exemplary route, it is that, and their placing of stop markers right on the signals.
You have to delete one train in a siding (that's protruding its signal) at service start and all is fine. Check the map and you'll spot it.
https://forums.dovetailgames.com/threads/blackpool-branches-feedback-thread.75992/page-9#post-755218 Though, if that is in Journey mode, it might be that you can't delete a train there (never play Journey), you can in Timetable mode.
In this service you need to go fast, i've had the same problem at first attemp, have tried to delete the train, but is needed for service and deleting it make the service unfinishable. At second attemp i've run fast as possible and was able to complete service