PC Crr Limited Power Ai Fails When Loading From Save

Discussion in 'TSW Troubleshooting & Issues Discussion' started by RagingLightning, Apr 18, 2021.

  1. RagingLightning

    RagingLightning New Member

    Joined:
    Aug 21, 2020
    Messages:
    19
    Likes Received:
    20
    I found an error in the "Limited power" scenario on CRR:

    When resuming from a save created just before splitting the train in two at the yard (attached to this post)
    1. I noticed, the Instrument Lighting doesn't start on, even though the switch is in the on position
    2. After splitting up the consist and continuing to the checkpoint under the loader for the first time, the AI helper starts approaching "his" part but doesn't take off, blocking the track for when the first set of cars is loaded with coal.

    Files:
    CheckpointSave: https://mega.nz/file/GUhXAC5A#e1nddVaJrM0VUhn0LB2zDnH0WHmKSRJ4Wn0joAPd04E
    Save: https://mega.nz/file/KN4RECwK#hZZ_rBYXz7FzhH40OpmG47SX2yb7joep8MOpAtJCg-w
     
  2. solicitr

    solicitr Well-Known Member

    Joined:
    Jun 20, 2020
    Messages:
    11,968
    Likes Received:
    18,358
    1) Instrument lights turning off when restoring is a known, but trivial, bug. The same happens with the cab light if you had it on.

    2) The AI loco's misbehavior is known, but doesn't appear to be caused by the save function.
     

Share This Page