PC Crr Limited Power Reverse Cabs Issue

Discussion in 'TSW Troubleshooting & Issues Discussion' started by Rudolf, Apr 18, 2021.

  1. Rudolf

    Rudolf Well-Known Member

    Joined:
    Dec 9, 2016
    Messages:
    2,497
    Likes Received:
    3,278
    When you go on your way back after completing loading, you ned to change cabs. The instructions are not complete and miss two important aspects: You also may need to switch off engine run, fuel pump and generator field.

    Set the cutout valve to cutout and the rotar valve to freight lap. It sloppy not too mention this, on the other hand you are asked to start the engine, which sounds weird to me.

    Eithe, do not give any detailed instructions or make them a complete step byt step guide with all in the correct order.
     
  2. raretrack

    raretrack Well-Known Member

    Joined:
    Dec 31, 2020
    Messages:
    351
    Likes Received:
    301
    Indeed! There are 14 seperate steps for changing ends in the EMD F7 manual.
     

Share This Page