I think it would be great (and with the new 64-bit, very possible) to finally finish the rest of the Northeast Corridor. Both from New Haven to Boston and from Philadelphia to Washington, DC. I also think that a Keystone service route from Philly to Harrisburg would be a great idea since that is electric as well.