For god's sake, please look over the UP services in the timetable for the Peninsula corridor, I've tried to play three just now, and all three have something wrong with them, often due to conflicts with the Caltrain switcher DLC. UP-1 south San Fran Yard has a cut of hoppers blocking the route, directly over a waypoint you must pass through. South City switcher still has a loco attached to the other end of the cars you are meant to couple to at the start, and when you reach the waypoint at the construction yard, it doesn't trigger. "Southbound Empties part 1" still auto-fails due to derailment when you try to couple to your consist, I suspect they are still occupying the same space as a consist from the switcher DLC as was the case in TSW1.