Hey folks, To celebrate the launch of the UP 119, the team have been working on a selection of fixes to the Smokebox line of DLC! CPR 4-4-0 No. 60 'Jupiter' * Prevent steam from escaping from the whistle after the long toot sound has finished. * Improved efficiency of the crosshead water pumps. * Pulling bar on AI loco now raises and lowers automatically whenever it is coupled to/uncoupled from the player-driven loco. * No sparks from wheelslip when the rail friction is "wet leaves". * Double-headed AI loco sets and releases its own handbrake in response to whistle signals from the player loco. * Corrected the timing of the exhaust chuffing when going backwards - this improves the sound and smoke/steam effects when backing up. * Reversed the direction of change of cab camera view when using the arrow keys. * Smoother feathering of safety valves. * Corrected the sound of the right-hand check valve clacking when backing up. * Stopped the wheels from rotating when positioned on a rotating turntable. AT&N Consolidation Class 280-157 * The Advanced version now correctly tracks condensation during the entirety of every piston stroke. UP 884 FEF-3 Northern & UP 884 FEF-3 Overland * The Advanced version now correctly implements the way that the brake system automatically applies the brakes when the player fails to acknowledge the alerter within 6 seconds of the alert. * The Advanced version now correctly tracks condensation during the entirety of every piston stroke.