Ny-trenton: Usa Content Is Still Severely Flawed

Discussion in 'TSW General Discussion' started by TripleJ814, Feb 9, 2023.

?
  1. I find the issues to not be a big deal, and it’s fine the way everything is

    17.1%
  2. I find the issues to be ridiculous and DTG needs to address this

    76.5%
  3. I have a differing opinion - it would be nice if you could reply to the thread explaining why

    6.4%
  1. StrikeEagle78

    StrikeEagle78 Well-Known Member

    Joined:
    Dec 29, 2019
    Messages:
    1,132
    Likes Received:
    3,484
    Lesson learned: If we want route improvements all we need is a 34 page forum post on each and it will get done (eventually) :D
     
    • Like Like x 8
  2. Crosstie

    Crosstie Well-Known Member

    Joined:
    Dec 8, 2016
    Messages:
    4,613
    Likes Received:
    10,410
    Squeaky wheel always gets the grease!l
     
    • Like Like x 1
  3. TripleJ814

    TripleJ814 Well-Known Member

    Joined:
    Feb 28, 2020
    Messages:
    415
    Likes Received:
    1,336
    Nice to see NY-Trenton timetable on the roadmap, I really hope they include static freight and LIRR layers down the road too.

    What really caught my eye on the roadmap though was this little bit
    12038ACA-7B96-493D-9418-5CB76F19F922.jpeg
    Really hope they will actually follow through with this and releases going forward have all the standardized features that are supposed to be there.


    Would love to see the NS Coal District route from TS1 make a return in TSW, it also includes street running :)
    7AC3C640-87D7-45CD-86CB-0E13B9029642.jpeg
     
    • Like Like x 4
  4. Joethefish

    Joethefish Staff Member

    Joined:
    Mar 13, 2018
    Messages:
    374
    Likes Received:
    1,553
    For now I wanna focus on talking about things that are complete, don't wanna go making promises I cannot keep. Though as usual the plan is everything. The challenge is making the plan into a reality. :)
     
    • Like Like x 26
  5. nepclassof84

    nepclassof84 Well-Known Member

    Joined:
    Feb 23, 2022
    Messages:
    650
    Likes Received:
    688
    I think I’m going to be ecstatic with the results. A full 2019 electric timetable is going to bring this route to life.

    I had faith that dtg would address this. I’m happy that faith was rewarded. I’m happier that you’re on the case.
     
    • Like Like x 6
  6. MAX1319

    MAX1319 Well-Known Member

    Joined:
    Jan 19, 2022
    Messages:
    2,101
    Likes Received:
    3,411
    Now that I know Joe is working the NYT timetable I know we are going to get a great NYT timetable . Harlem line in my opinion curretly has the best US timetable which he put together. Today is a good day and it looks like our feedback and frustration paid off. Great job to all that gave feedbacks and spoke up.
     
    • Like Like x 6
  7. TripleJ814

    TripleJ814 Well-Known Member

    Joined:
    Feb 28, 2020
    Messages:
    415
    Likes Received:
    1,336
    Thank you Joe, your work is highly appreciated.

    Just as a consideration for the timetable, if a LIRR layer isn’t possible (due to memory usage concerns and/or dispatcher issues due to all the trains, etc) maybe some static LIRR trains parked at New York Penn could be done instead?

    Of course I’d prefer a working LIRR layer, but static trains would be much better than nothing on that front.


    Thanks again :)
     
    • Like Like x 3
  8. Pixelade

    Pixelade Well-Known Member

    Joined:
    Aug 22, 2021
    Messages:
    281
    Likes Received:
    507
    I'm so shocked, I genuinely didn't think this would happen, but I love being proven wrong. Thank you to everyone here who not only started the threads but also kept them going for months, this wouldn't have happened without you. Today is a day to celebrate. :love:

    I know many are sad about no LIRR, but this is going to make the route come alive, so I personally am ok with sacrificing LIRR to have a full timetable that changes the feeling of the entire route over services that only really impact NYP.
     
    • Like Like x 10
  9. Krazy

    Krazy Well-Known Member

    Joined:
    Nov 13, 2020
    Messages:
    654
    Likes Received:
    1,508
    I’d still love to see at the very least some freight sitting along the line, it really is a game changer on Boston. But I can’t complain about the fact that we’re finally going to get a good NJT timetable! They really did it, they didn’t abandon us?

    Now then, can you please fix the trains clipping through poles and platforms at NY Penn, DTG?
     
    • Like Like x 2
  10. pveezy

    pveezy Well-Known Member

    Joined:
    Dec 18, 2021
    Messages:
    722
    Likes Received:
    1,221
    Woohoo! Great news. Thanks to DTG for listening to the feedback and working on making the issue right. The route itself is very good and it was a shame that it was let down by a timetable which (frankly) was unfinished. It would be nice if each DLC was perfect on release, but knowing you recognize issues and will work to fix flaws even after release makes me a lot more likely to keep buying DLC (not only did I buy NYT on release but I actually bought it twice, on XSX and PS5).

    Also, even thought he route does have flaws outside of the NJT timetable (LIRR, clipping, etc) I am happy that out of the gate you focused on the most glaring one which is the lack of traffic on the main core route (between Penn and Trenton).
     
    • Like Like x 2
  11. MAX1319

    MAX1319 Well-Known Member

    Joined:
    Jan 19, 2022
    Messages:
    2,101
    Likes Received:
    3,411
    So looking at possible numbers that we can see and I'm excited.
    upload_2023-5-2_15-58-38.png
    So looking at the possible numbers of total services one way to Penn station, looking at the current timetable with the above train numbers I have come up with the following:
    Montclair line- 21 (AI only) Secaucus junction
    morris&essex line-35 (AI only) Secaucus junction

    north jersey coat line-35 (Rahway)
    nec-67 (Trenton, Jersey city)
    total 158 to penn station. I didn't include any AI to hoboken
     
    Last edited: May 4, 2023
  12. Pixelade

    Pixelade Well-Known Member

    Joined:
    Aug 22, 2021
    Messages:
    281
    Likes Received:
    507
    so I guess when all is said and done we are likely doubling the total amount of services for the route? :o
     
  13. theorganist

    theorganist Well-Known Member

    Joined:
    May 1, 2018
    Messages:
    5,592
    Likes Received:
    11,569
    This route has now gone from not even in a sale to a definite purchase, I might even get it over the weekend in readiness.
     
    • Like Like x 4
  14. NateDogg7a

    NateDogg7a Well-Known Member

    Joined:
    Sep 8, 2021
    Messages:
    536
    Likes Received:
    772
    Obviously a great outcome. Perhaps that doesn't need to be explicitly stated, but I do feel that it is important to be positive, as well as critical, where appropriate. It appears that this whole experience might even start to move the game itself in a better direction. I look forward to buying the improved NYT. Thanks DTG.
     
    • Like Like x 3
  15. Lunar_Twisted

    Lunar_Twisted Well-Known Member

    Joined:
    Oct 7, 2019
    Messages:
    273
    Likes Received:
    426
    Those who missed the discussion about the new timetable improvements from the livestream, start from 1:05:00.

     
    • Like Like x 1
  16. PseudoStalker

    PseudoStalker Well-Known Member

    Joined:
    Sep 9, 2021
    Messages:
    293
    Likes Received:
    463
    I thought they were saving room for future DLCs: Arrow III, NJCL with ALP-45DP, some freight loco like 3GS-21B, etc. I don't like this simplification and substitution. Yes, congratulations, you found a comment from someone who is unhappy with this solution.
     
  17. cloudyskies21

    cloudyskies21 Well-Known Member

    Joined:
    May 9, 2021
    Messages:
    1,283
    Likes Received:
    3,566
    This is great news - NY-Trenton was a route that interested me upon first hearing but, like with MML, the initial timetable was a major let down so I didn't think it was worth it. However, with a revamped, busy timetable I might finally get NY-Trenton - along with the Acela as I'm a fan of Boston too.

    Overall, I'm happy the timetable for NY-Trenton (and MML) are to be revamped, though I still think it's highly frustrating that it took a lot of community feedback to push for such busy timetables - which should be a standard feature, especially when DTG have routes like London Commuter or Dresden etc.
     
    • Like Like x 1
  18. rennekton#1349

    rennekton#1349 Well-Known Member

    Joined:
    Jun 5, 2022
    Messages:
    6,395
    Likes Received:
    4,160
    Space is left for the arrow 3 since those services were not included. Same with any diesel services. Njt doesn't have a lot of locomotives to work with. It's around 30 alp46s and 46as. It's either you have an empty timetable which people got extremely angry about or you have a busier timetable which is what the route was advertised as being the busiest part of the nec. Dtg can't please everyone unfortunately. Currently there is no option to choose what layers are available, but when you got a majority of players complaining about a lackluster timetable, dtg can't just sweep it under a rug.
     
    • Like Like x 3
  19. nepclassof84

    nepclassof84 Well-Known Member

    Joined:
    Feb 23, 2022
    Messages:
    650
    Likes Received:
    688
    I’d say closer to triple
     
    • Helpful Helpful x 1
  20. PseudoStalker

    PseudoStalker Well-Known Member

    Joined:
    Sep 9, 2021
    Messages:
    293
    Likes Received:
    463
    Because there is no trains to fill this timetable. This is the fault of DTG, not the timetable itself.
    I'd rather wait for the expansions to come out. Arrow III and Comet railcars will give us many realistic services. ALP-46 with double-deck barn not the best replacement for them. It's unrealistic.
     
    Last edited: May 2, 2023
  21. MAX1319

    MAX1319 Well-Known Member

    Joined:
    Jan 19, 2022
    Messages:
    2,101
    Likes Received:
    3,411
    Here are the numbers from Penn station
    Montclair line-22(AI only) Secaucus Junction
    Morris&Essex-41(AI only) Secaucus Junction
    North jersey coast line-34(Rahway)
    NEC-64 Trenton, Jersey city
    Total 161 from Penn station
    Total 319 NJT services. These don’t include the deadheads or yard moves. A rough estimate but if Joe gets to add some freight static, freight AI, and the LIRR, this would make this route epic. I can’t wait and it gives hope to hopefully get a future New Haven line with the M8
     
    Last edited: May 4, 2023
    • Like Like x 2
  22. darrentee01

    darrentee01 Member

    Joined:
    Jan 23, 2022
    Messages:
    55
    Likes Received:
    43
    Always thought it was a very good representation of the route ,only services were poor,with the updates will make it complete as is possible with all current rolling stock,well done DTG!
     
  23. chacal#2181

    chacal#2181 Well-Known Member

    Joined:
    Oct 11, 2021
    Messages:
    363
    Likes Received:
    549
    That may change my opinion of this route.
    For me TSW was always about busy timetables, railfaning at full of trains stations or driving around with trains going evrywhere.
    Will wait for the result.
     
    • Like Like x 1
  24. ctlee#2068

    ctlee#2068 Active Member

    Joined:
    Feb 21, 2023
    Messages:
    184
    Likes Received:
    127
    • Like Like x 1
  25. Turbojugend

    Turbojugend Well-Known Member

    Joined:
    Mar 23, 2020
    Messages:
    278
    Likes Received:
    379
    Huge thumbs up to DTG for making this happen. I'm not as train/route knowledgeable as most here, so I don't know any other way to explain this except that NYT is currently missing its soul. Compared to other great TSW routes, it just feels stiff and lifeless. I'd be overjoyed to see anything that would make me want to play it again.
     
  26. MAX1319

    MAX1319 Well-Known Member

    Joined:
    Jan 19, 2022
    Messages:
    2,101
    Likes Received:
    3,411
    Joethefish I have a question about services from the Morris &Essex line and Montclair-Boonton line. Are the services that stop at secaucus junction going to now be player playable services? or Just continue to be AI only? I know currently those limited services that we do have are not. This would be great since they would be short like the ones on London commuter like the London bridge services.

    upload_2023-5-3_8-30-14.png
    upload_2023-5-3_8-32-2.png
     
    Last edited: May 3, 2023
  27. steveownzzz#6107

    steveownzzz#6107 Well-Known Member

    Joined:
    Apr 24, 2021
    Messages:
    613
    Likes Received:
    919
    Very excited for NJT timetable updates.

    I won't get my hopes up because I don't know what the performance hit would be like, but I really hope we're able to get some static and moving AI freight in there as well, like there is for Harlem. I'd love to one day have another US route with passenger and freight (like Peninsula Corridor)
     
  28. lupojohn

    lupojohn Active Member

    Joined:
    Jun 8, 2020
    Messages:
    158
    Likes Received:
    134
    As someone who regularly commutes on the route to work, takes photos of it and whatnot, I think I am more equipped to speak about it than most here.

    I believe Seacaucus Junction lower level is if not available to travel down to, at least visible in the game and kudos to the developers for that, but the problem is that you need the proper equipment there even if it's static. They are completely different routes than the upper level.

    I saw Princeton Junction mentioned and you MUST put that in. It's only 2 miles long, a unique branch line that you could several things with and runs a Dinky. You could have 1 or 2 car trains and the only equipment used is Arrows, which you could then layer into Secaucus Junction lower level.

    When you get out of the tunnel to go to Seacaucus Junction, there are tracks visible that run under the NJT service. Those are CSX tracks and again, at the very least, static trains would be nice.

    If the line is to be extended perhaps DTG could try to acquire the SEPTA license. Not only would you be able to run service there as SEPTA starts at Trenton, but you could run Amtrak to 30th Street station, solving a problem mentioned in the screenshot above.

    This is a minor detail, but at least twice I have ridden Arrows on this route so maybe throwing them on the line would be a good idea.

    There is more but I don't want to overload Joethefish with too much to do as I am sure he is busy with other aspects of the game.
     
    • Like Like x 1
  29. rennekton#1349

    rennekton#1349 Well-Known Member

    Joined:
    Jun 5, 2022
    Messages:
    6,395
    Likes Received:
    4,160
    While it is only 2 miles doesn't actually mean it's easy at all. Scenery is probably not going to take a while but the actual signaling and timetable would be complicated.
     
    • Like Like x 1
  30. lupojohn

    lupojohn Active Member

    Joined:
    Jun 8, 2020
    Messages:
    158
    Likes Received:
    134
    I understand, but that hasn't stopped them from rushing to produce a sub-standard route as 34 pages in this thread show.

    While it's a required part of the route, it would also go a long way (as a goodwill gesture of sorts) to building back the trust they clearly lost with some of the recent issues.
     
    • Like Like x 1
  31. Thelonius16

    Thelonius16 Well-Known Member

    Joined:
    Sep 21, 2017
    Messages:
    284
    Likes Received:
    632
    There's no reason why they couldn't re-assign those services if they make any of those DLCs. That's what happened with the Baby Bullet on Pennisula Corridor.
     
  32. Joethefish

    Joethefish Staff Member

    Joined:
    Mar 13, 2018
    Messages:
    374
    Likes Received:
    1,553
    Great idea! I'll keep that in mind if something were to going wrong. Let's hope it does not come to that. :)
    So these services I'm keeping AI for a few reasons. The short services on BML you mention had a lot of feedback saying they're quite pointless. I'll be honest with you, I disagree with that. But in this case the services spent most of their time in the Hudson tunnels which isn't too exciting.

    The more logistical issue was the time taken to swap them between passenger and AI at Secaucus. With reasonable setup time as well, it meant the next train due in that platform was then late. Secaucus, especially in peak times, it's a bit of a bottleneck now.

    So they won't be drivable but you can still see them around, more than what you're currently used to as well! Of cousre, their SSY deadhead moves are all drivable though so that's fun :)
     
    • Like Like x 13
  33. lupojohn

    lupojohn Active Member

    Joined:
    Jun 8, 2020
    Messages:
    158
    Likes Received:
    134
    Can you address my points please?
     
  34. ajp31

    ajp31 Active Member

    Joined:
    Mar 22, 2018
    Messages:
    59
    Likes Received:
    101
    Joethefish, were you able to make use of more pathing options around Secaucus, using the outer platforms for station stops sometimes and the inner tracks for their full lengths between Portal and Allied interlockings for the trains that use the island platform? This, and making use of both westbound platform tracks at Trenton, would help mitigate some of the bottlenecks, I would imagine.

    Regardless, THANK YOU for all of your efforts in bringing this more robust timetable to us!!!
     
    • Like Like x 1
  35. northeasttrainman

    northeasttrainman Active Member

    Joined:
    Feb 9, 2023
    Messages:
    109
    Likes Received:
    89
    Here's something I'm looking forward to / finding interesting, the amount of "hiccups" with new trains & AI.
    In the current build, or at least when I filmed this, there's this funny (imo) hiccup at Trenton.

    When you play Amtrak Northeast Regional 130, you spawn DIRECTLY behind Acela Express 2154.
    In real life, this wouldn't happen because Acela 2154 doesn't stop at Trenton.

    So between EVERY Acela (with the exception of a few in scenarios) stopping at Trenton and increased NJT services, will DTG look into utilizing "Track 5" at Trenton? The one SEPTA primarily uses nowadays? It's one of the only tracks that isn't used AFAIK in the game.
    I just don't want there to be massive pileups / backed up trains at Ham & Fair Interlockings like the Harlem Line DLC had at Mott Haven.

    Also, will this lead to more use of interlockings such as Midway, Lincoln, Edison, County (for non Jersey Ave trains), and Delco?

    I rode on a number of Amtrak trains in real life heading eastbound that used County when Fair interlocking was busy.
    Midway is typically used when 1 or 4 are OOS between Fair & Midway.
     
    • Like Like x 1
  36. northeasttrainman

    northeasttrainman Active Member

    Joined:
    Feb 9, 2023
    Messages:
    109
    Likes Received:
    89
    Something similar occurred with M3s on the LIRR, the M3s were interchangeable with M7s.
    So, if Arrow 3s are eventually made for TSW 3, I imagine they would replace existing services, rather than have their own exclusive ones.
    That said, I would like for them to at least have a scenario or two. But, we'll have to cross that bridge when we get to it.
    Not the Morrisville bridge to the Morrisville Yard though..*insert side eye (in jest)*

    Sidenote (slightly unrelated), does anyone know which real life NJT NECL trains are assigned Arrow 3s?
    Whenever I take NJT it feels like every other train is an Arrow 3, EXCEPT mine. One day I'll meet my match, one day.
     
  37. northeasttrainman

    northeasttrainman Active Member

    Joined:
    Feb 9, 2023
    Messages:
    109
    Likes Received:
    89
    Also, one other thing. Will DTG work on the following regarding Secaucus?:
    1. Increased use of ALLIED, ERIE, LACK & PORTAL Interlockings. Mainly the use of Track A between ALLIED & ERIE, and LACK & PORTAL.
    2. Having NJT revenue trains utilize ALL 4 tracks at Secaucus Upper. Currently all NJT revenue services serving Secaucus in the game only use A & B, when in reality they use 3 and 2 as well, ideally when there isn't a train directly behind them.
    Here are few photos & videos of NJT trains utilizing the various tracks at Secaucus in real life:
    1. https://www.railpictures.net/photo/813392/
    2. https://www.railpictures.net/photo/814359/
    Here's a track layout of Secaucus Upper & the interlockings surrounding it, it's on Page 64:
    Currently I believe only a handful of Jersey Ave deadhead runs use Track A Eastbound between ERIE & ALLIED.
    The only diverging move takes place in the "Havoc on Hudson" scenario, where your train diverges from 2 to A to 3 from PORTAL to ALLIED.
    I believe this was brought up earlier in the thread as well. It could improve On Time Performance for NJT trains that stop at Secaucus.
     
    • Like Like x 3
  38. MAX1319

    MAX1319 Well-Known Member

    Joined:
    Jan 19, 2022
    Messages:
    2,101
    Likes Received:
    3,411
    Thanks Joe for that explanation. It makes sense about the drive from Penn to Secaucus being mostly stuck on the Hudson tunnels. With that said I can narrow down the NJT playable passenger services which would be from the northeast corridor line, and north jersey coast line. Hope to see some freight AI going across the elevated track around hunter yard like we see in the scenario Cab race.that CSX freight train looks fantastic. Also the static freight around stiles yard and NJT trains around the NJ Hudson yard and meadows complex. I have a question,would the LIRR trains be isolated to the two northern tunnels(manhattan shaft line 3 and 4? They wouldn’t interfere with NJT or Amtrak trains? I’m so pumped about this route finally coming to life….
     
  39. nepclassof84

    nepclassof84 Well-Known Member

    Joined:
    Feb 23, 2022
    Messages:
    650
    Likes Received:
    688
    It’s more than a bit of a bottleneck. In real life it’s a biiiiiig bottleneck. If in your work you’re seeing stuck stack up there you’re doing something right
     
  40. Joethefish

    Joethefish Staff Member

    Joined:
    Mar 13, 2018
    Messages:
    374
    Likes Received:
    1,553
    I can only really cover the points that are timetable related, which is this one:
    The plan is to have static stock yes.
    Currently already using outer platforms in peak hours :) Even bi-directionally in extreme cases.
    That is something I'll find out only in the future. LIRR make use of all tunnels during the rush hour so I want to try and make it work. Though there is a lot of SSY deadhead activity between 09:00-10:00 which may make that more difficult. But as I say, cannot know for sure right now.
    I was being modest, do not worry :D
     
    • Like Like x 9
  41. hiromaru

    hiromaru Active Member

    Joined:
    Jan 18, 2023
    Messages:
    185
    Likes Received:
    66
    A train passing each other in aorta waits in the expectation in large quantities
     
  42. Typhomat

    Typhomat Well-Known Member

    Joined:
    Dec 8, 2016
    Messages:
    214
    Likes Received:
    606
    Maybe I missed it, but all I see so far is the updated timetable announced, which is awesome, but what about the other bugs like signaling? I'm excited for the updates, but the timetable wasn't the only issue with this route.
     
    • Like Like x 2
  43. lupojohn

    lupojohn Active Member

    Joined:
    Jun 8, 2020
    Messages:
    158
    Likes Received:
    134
    He says he only handles timetable-related issues. In that case, he should take our points and forward them to whoever handles that stuff.
     
  44. Typhomat

    Typhomat Well-Known Member

    Joined:
    Dec 8, 2016
    Messages:
    214
    Likes Received:
    606
    It's a broader question to DTG. I never was intending this was on Joe, and it isn't his responsibility to forward our issues to whomever handles these issues either, that's for the QA and Support team to document and resolve separately as issues are reported in the feedback thread and tickets.

    I'm concerned that the larger timetable might evoke more signal problems, and I'm hoping DTG is looking into this. I'm doubtful though given no announcement
     
    • Like Like x 1
  45. MAX1319

    MAX1319 Well-Known Member

    Joined:
    Jan 19, 2022
    Messages:
    2,101
    Likes Received:
    3,411
    I suspect that the new services will bring more signals problems. Wanted to bring this forward to this thread to help spread this to hopefully find a long term fix.
     
    • Like Like x 4
  46. MAX1319

    MAX1319 Well-Known Member

    Joined:
    Jan 19, 2022
    Messages:
    2,101
    Likes Received:
    3,411
    Thanks Joe for that. I know we are using the 2019 timetable for the NJT but not sure if it will make it easy to use the current timetable for the LIRR since about 35% of the services now go to new Grand Central Madison. on the road map article it mentions no AI traffic at secaucus junction. Is that statement meant for the lower secaucus junction or both? Also it mentions AI electric trains to Hoboken terminal will be included. Do you have the train numbers for those that will be going to Hoboken as AI since I don't see any of the listed 31XX,32,35,37,38,39, and 6XXX trains going to Hoboken terminal
    upload_2023-5-4_8-48-41.png
     
  47. NB642

    NB642 Active Member

    Joined:
    Mar 19, 2018
    Messages:
    59
    Likes Received:
    149
    Joe can correct me if I’m wrong here, but my guess is that the Hoboken services would represent the 26XX series trains between Hoboken and Long Branch.
     
  48. cloudyskies21

    cloudyskies21 Well-Known Member

    Joined:
    May 9, 2021
    Messages:
    1,283
    Likes Received:
    3,566
    I completely agree with you. The shorter services for BML are realistic, thus having them means a busier, proper timetable as well. So, please continue adding such shorter services for all future route timetables you do - as this certainly provides more variation and long-term gameplay too from the timetable.
     
    • Like Like x 4
  49. lupojohn

    lupojohn Active Member

    Joined:
    Jun 8, 2020
    Messages:
    158
    Likes Received:
    134
    I don't file a ticket because it takes them forever to respond.

    Considering DTG staff know tickets take a while, Joe forwarding it to the correct department is not a big deal.

    Similar to the SPG Derail thread. Matt directly asked me what was wrong, I told him and am still waiting for a reply.

    He asked me months ago.
     
  50. malikrthr

    malikrthr Well-Known Member

    Joined:
    Mar 1, 2019
    Messages:
    778
    Likes Received:
    1,286
    It is really good to see the NY-Trenton route being improved with a variety or newer services. I think at some point, we could potentially see add on DLC's available like the Arrow III and NJT ALP45DP with Comet V coaches, which could then be substituted for those services that use other rolling stock. Really good to see that this will be following the prototypical NJT timetable for 2019. In some services, I have seen a few static hoppers along the sidings but to have more static trains in scene will for sure enhance the game play and make the route feel busier
     
    • Like Like x 1

Share This Page